Prefabricated Wooden Frame Houses

English speaking department:

  1. prefabhome.eu - EN
  2. -
  3. Blog

Blog

Checklist "Plaster or exterior wall cladding"

This checklist guides you through choosing between exterior plastering or cladding, properly preparing walls, and applying the finish to achieve a durable, weather-resistant facade that meets project and local regulatory requirements.

Step-by-step guide "Installing exterior slopes on windows and doors"

This step-by-step guide explains how to install exterior window and door reveals (slopes), covering surface preparation, profile setup, material selection, secure fixing, and final sealing to protect openings from moisture, drafts, and temperature changes.

Infographic "Cleaning of construction debris"

This step-by-step guide explains how to install exterior window and door reveals (slopes), covering surface preparation, profile setup, material selection, secure fixing, and final sealing to protect openings from moisture, drafts, and temperature changes.

Checklist "Preparation of interior spaces for finishing works"

This checklist provides a step-by-step guide to preparing interior spaces for finishing works, covering surface cleaning, defect repair, priming, and floor preparation to ensure durable, high-quality results.

Checklist for "Recording construction stages in a log"

This checklist explains how to accurately record each construction stage in a site log, including regular dated entries, supporting documents (acts, receipts, certificates, photos), and signed quality acceptances to ensure transparency and compliance with standards.

Step-by-step guide "Conducting intermediate acceptance"

This step-by-step guide explains how to carry out an interim acceptance of construction works, including inspection, defect identification, documentation, correction planning, and quality control to ensure compliance with design and building standards.

Checklist "Identification and elimination of defects before the next stage of construction"

This checklist outlines how to systematically inspect completed works, identify and document defects, test engineering systems, and ensure all issues are resolved before moving on to the next construction stage.

Checklist "Purchase of necessary materials for roof installation"

This checklist helps organize and verify the purchase of all essential roofing materials—including structural elements, roofing cover, insulation, waterproofing, and fasteners—to ensure durability, compliance with standards, and a smooth installation process.

"Installation of horizontal slats (crates) on the rafters"

This step-by-step checklist explains how to select materials and tools, install roof battens evenly from the eaves upward, and verify alignment with a level to create a strong, accurate base for the roofing cover.

Infographic "Control of the distance between slats depending on the type of roof"

This infographic shows the recommended spacing between roof battens for different roofing types, helping ensure proper installation, structural reliability, and long-term durability of the roof.

"Installation of vertical rails (counter-gratings)"

This guide explains how to install vertical counter-battens step by step to create a proper ventilation gap between the roofing layers, preventing moisture buildup and ensuring long-term durability and thermal performance of the roof.

"Providing ventilation of the under-roof space"

This checklist explains how to ensure proper roof space ventilation to prevent moisture buildup, reduce condensation, and extend the lifespan of roofing materials through effective airflow management.

© 2017-2024

Suivez-nous sur