Welcome! This step-by-step guide is designed to help you properly prepare work completion certificates for the foundation. By following the steps provided, you will be able to complete the documents in accordance with regulatory requirements, ensure their accuracy, and secure timely signatures from responsible parties.

Preparation of Documentation

Preparation of certificates. Prepare work completion certificates for each stage of the foundation construction. These may include certificates for earthworks, reinforcement, concrete pouring, insulation installation, etc. Each certificate must contain a description of completed work, the quantity of materials used, and their cost.

Italian laws: According to Italian legislation, work completion certificates (known as “atti di lavoro”) serve as confirmation of construction services performed and may be required for settlements with contractors and subcontractors according to the contract.

Clarifying details. Before signing the certificates, check all data: start and end dates of each stage, work volumes, materials used, as well as the quality of completed work. If there are errors or inaccuracies, they must be corrected to avoid legal and financial consequences.

Complex terms:
Work volumes (volumi dei lavori) — the quantity or area of work completed, which must be clearly reflected in the certificate for cost calculation.
Contract (contratto) — a legal agreement between parties regulating conditions and obligations.

Signing the Certificates

Recording work stages. Record each completed work stage in detail in the construction log. Start with earthworks such as excavation and soil reinforcement, then continue with all intermediate steps including foundation installation, waterproofing, insulation, and installation of the blind area. It is important to indicate start and finish dates, materials used, and methods.

Note: In Italy, maintaining such a journal is regulated by Articles 216 and 217 of the Civil Code and technical standards requiring proper documentation for commissioning.

Signing by responsible persons. Ensure that each entry in the log is certified with signatures of responsible parties: the engineer, site foreman, and representatives of the contracting company. Signatures confirm compliance of the completed work with the project and construction standards. This is also necessary for approval of stages by inspection authorities.

Explanation: Responsible persons are specialists who bear legal and professional responsibility for the execution, quality, and safety of the work.

Complex terms:
Authorized person (persona autorizzata) — a person officially authorized to sign documents on behalf of the client, such as the company director or their representative.
Civil Code (Codice Civile) — a legislative act regulating civil legal relations, including construction contracts and obligations.

Conclusion

Proper preparation and signing of work completion certificates is an important stage of the construction process, ensuring transparency and legal compliance for all obligations. Signed certificates document the completion of each stage and form the basis for settlements with the contractor. Make sure that all documents are prepared correctly and signed by all relevant parties to avoid misunderstandings or legal issues in the future.

Instructions for Using the Checklist “Preparation of Work Completion Certificates and Their Signing”

Preparation of documentation: Before filling out the checklist, make sure you have all necessary documents and data for preparing work completion certificates.

Filling out certificates: Go through each stage of the work and ensure that all information — such as volumes, deadlines, and quality — is accurately reflected in the certificate.

Signing the certificates: Submit the certificates to the contractor for review and signing. Then forward them to the client for final approval.

Archiving: After signing the certificates, keep copies of all documents for future reporting or recovery if needed.

This checklist will help you systematize the process of preparing certificates and ensure correct and timely documentation of all construction stages.