Prefabricated Wooden Frame Houses

English speaking department:

Checklist “Removal of Excess Soil or On-Site Storage for Future Use”

Welcome!

This checklist will help you effectively organize the process of removing excess soil or storing it on site. By following the recommendations, you will be able to properly calculate the volume, prepare a storage area, and minimize disruptions to the construction process.

Determining the Volume of Soil

Measuring the pit or trenches. Measure the length, width and depth of the excavation area.

Volume calculation. Multiply length × width × depth to determine the total soil volume (m³).

Planning removal or storage. Evaluate the options for transporting the soil off-site or temporarily stockpiling it on the property.

Organizing Soil Removal

Finding a contractor. Select companies that provide soil removal services, considering required volumes and deadlines.

Ordering machinery. Arrange for specialized machinery (dump trucks) to remove the excess soil.

Selecting a landfill site. Ensure the soil is transported to a licensed landfill that complies with environmental requirements.

On-Site Storage

Choosing a location. Select a safe area on the site for temporary soil stockpiling so it does not interfere with ongoing construction work.

Preparing the platform. Ensure the storage surface is level and protected from erosion caused by precipitation.

Future reuse. Plan possible reuse of the soil for backfilling or landscaping work.

Main Laws and Regulations

In Italy, the process of soil removal and on-site stockpiling is strictly regulated by environmental and construction laws. The main regulations include:

  • Legislative Decree No. 152/2006 (“Environmental Code”) — Regulates waste management, including excess soil, and establishes requirements for disposal and storage.
  • Technical Construction Standards (NTC) — Define rules for handling soil on construction sites, including volume calculation and stockpile management.
  • Municipal regulations — Local authorities may impose additional requirements regarding soil removal and storage, including mandatory use of certified landfills.

Compliance with these regulations is mandatory to avoid fines and environmental violations. Before starting work, it is recommended to consult a licensed surveying or construction company.

Conclusion

Organizing soil removal or storage is an important stage of construction that requires thorough planning and compliance with regulatory requirements. Ensure that soil volumes are calculated accurately, machinery and landfills chosen legally, and on-site storage arranged safely and efficiently.

Following Italian environmental and construction laws guarantees proper execution, minimized environmental impact, and avoidance of fines.

Instructions for Using the Checklist “Removal of Excess Soil or On-Site Storage for Future Use”

  1. 1
    Read the checklist.

    Review all steps to understand the workflow.

  2. 2
    Determine the soil volume.

    Calculate the amount of soil to remove or store.

  3. 3
    Select the appropriate option.

    Decide whether the soil will be removed or temporarily stored.

  4. 4
    Organize machinery.

    Order transport for removal or prepare the on-site storage area.

  5. 5
    Follow legal requirements.

    Ensure all actions comply with local regulations, including disposal and storage rules.

  6. 6
    Verify completion.

    Monitor the process to ensure accuracy and adherence to the plan.

This checklist will help you safely and efficiently manage soil on your construction site.

© 2017-2024

Suivez-nous sur