Checklist “Preparation for the Start of Wall and Slab Construction”
Welcome! This checklist will help you step by step to prepare the foundation for the start of wall and slab construction. Proper preparation is the key to the strength, reliability, and durability of your building. By following this checklist, you will be able to avoid mistakes and provide a high-quality base for further construction work.
Cleaning the foundation. Make sure that the foundation surface is cleaned of dirt, dust, and construction residues before starting work. This guarantees reliable adhesion of materials and prevents the appearance of defects.
Note: In accordance with Italian standards UNI EN 1998, the cleaning stage is mandatory to ensure structural reliability.
Checking flatness and level. Check that the foundation is even and horizontal. Use a construction level or laser level to avoid misalignment when laying the first wall courses, which can lead to load redistribution and cracking.
Moisture protection. Apply waterproofing (for example, bitumen mastic or a membrane) to the foundation surface to prevent moisture penetration. This is especially important in areas with a high groundwater level.
Note: In Italy, the use of waterproofing is regulated by standards such as UNI 11493, aimed at ensuring building durability.
Wall layout. Using a tape measure, mason’s line, and marker, mark out the areas for laying the first rows of blocks or panels. Make sure that the layout matches the project so that the walls are erected strictly within the design boundaries.
This checklist will help you minimize mistakes and speed up the construction process.
Instructions for Using the Checklist “Preparation for the Start of Wall and Slab Construction”
Study the list of steps: Carefully review all items in the checklist to understand the preparation stages.
Prepare tools and materials: Make sure you have all necessary equipment, including a construction level, waterproofing materials, and marking tools.
Follow the steps in order: Complete the checklist items sequentially, starting with foundation cleaning and ending with wall layout.
Check the results: After completing each stage, control the quality of the work to ensure compliance with the requirements.
Use references to standards: If necessary, refer to regulatory documents (for example, Italian UNI standards) to clarify requirements.
This checklist can be printed or used on a mobile device for convenience on the construction site.