Step-by-Step Guide “Filling and Compacting Crushed Stone Over a Sand Cushion”
Welcome! This guide will help you properly fill and compact crushed stone at the bottom of an excavation or trench, creating a reliable and durable base for further construction work. By following these simple steps, you will be able to ensure high quality and durability of the completed work.
Filling Crushed Stone
Choosing the crushed stone fraction. Use crushed stone with a 20–40 mm fraction to create a strong base. This fraction size provides good stability, drainage properties, and resistance to deformation. It is important that the crushed stone is cleaned of impurities and contaminants, as this affects its strength and durability. According to Italian legislation (for example, the Construction Law – Decreto Legislativo 163/2006), the quality of materials used in construction must comply with standards to ensure the safety and reliability of the structure.
Filling the crushed stone layer. Fill crushed stone in a layer 10–15 cm thick over the sand cushion. Distribute the crushed stone evenly over the entire surface to avoid the formation of voids. It is important to maintain the correct layer thickness to ensure a reliable base, which is also stipulated in Italian construction standards, for example in the National Technical Regulations (NTC), which regulate the design and execution of construction work. At the same time, according to the regulations, the thickness of each filling layer must be checked and approved in the project in order to avoid errors and ensure durability.
Explanation of Terms
Crushed stone fraction: the size of the material particles. Crushed stone with a 20–40 mm fraction has optimal properties for use in construction, as it provides good interlocking and drainage.
Drainage properties: the ability of the material to allow water to pass through, preventing its accumulation and improving the stability of the base.
Sand cushion: a layer of sand used to create an even and stable base before laying larger materials such as crushed stone.
The use of high-quality materials and compliance with standards is mandatory for construction safety, as prescribed in Italian construction laws and regulations such as Decreto Ministeriale 14 gennaio 2008.
Compacting Crushed Stone
Compaction with a vibrating plate. Use a vibrating plate or roller to compact the crushed stone layer. The vibrating plate effectively compacts the material, creating a strong and stable base, which is a necessary step to prevent settlement and deformation of the foundation in the future. The vibration created by the machine helps distribute the crushed stone evenly and improve its interlocking. It is important that the equipment used complies with the standards provided by construction regulations such as Decreto Legislativo 81/2008, which regulates safety on construction sites in Italy.
Level control. After compaction, check the level of the crushed stone using a spirit level or laser level. This will make it possible to ensure that the crushed stone layer has the correct thickness and uniformity, which is critically important for the stability of the structure. It is important to observe the exact indicators of thickness and level specified in the project documentation in order to avoid further errors, which is also stipulated in Italian construction standards such as the National Technical Regulations (NTC). These standards require regular inspections at each stage of construction to ensure the reliability and durability of the building.
Explanation of Terms
Vibrating plate: a machine that uses vibration to compact materials such as crushed stone, sand, or soil. It helps distribute the material evenly and prevent its settlement.
Roller: construction equipment used to compact materials by means of pressure and vibration.
Level: a geodetic instrument for measuring levels and heights, which helps accurately control the thickness and evenness of the backfill.
Conclusion
Filling and compacting crushed stone over a sand cushion is an important stage in foundation preparation, which directly affects the strength and durability of the entire structure. Attention to the correct choice of crushed stone fraction, even distribution of the layer, and thorough compaction using a vibrating plate or roller contributes to creating a stable base that is resistant to settlement and loads.
Instructions for Using the Guide “Filling and Compacting Crushed Stone Over a Sand Cushion”
Read the checklist before starting work to understand all stages of filling and compacting crushed stone.
Preparation: make sure that the sand cushion is level and prepared. Choose crushed stone with a 20–40 mm fraction for a reliable base.
Filling: fill crushed stone in a 10–15 cm layer, distributing it evenly over the entire surface.
Compaction: compact the crushed stone using a vibrating plate or roller to create a dense layer. Check the level of the crushed stone to ensure its uniformity.
Control: monitor the thickness and density of each crushed stone layer during the work.
This checklist will help you correctly perform the work and comply with construction standards.





